Public Physical Ledger / Cadence Lens

Accepted actions have cadence. Cadence is not a verdict.

Public balancing records can show how often an asset is visibly called, how short those calls are, whether direction switches are frequent, and whether high-cadence roles separate from high-volume roles. That public footprint can justify a better evidence request. It cannot diagnose internal condition.

Claim boundary. Public accepted-action cadence is an external duty lens only. It is not asset health, fatigue, degradation, delivery quality, dispatch causality, revenue quality, credit, underwriting, investment, safety, or control advice.
Why this page changed

Public pages should show the mirror, not expose named units

This URL previously rendered named BM Unit cadence rankings for a June 2026 window. The maintained public version now uses the same lens as a method and evidence-request page. Named BM Unit outputs belong in authorised private packs, or in anonymised specimen examples.

Public-safe output

Fleet distribution

Quantiles, counts, bands, p95 ranges, and role archetypes. These allow public discussion without turning the page into a named-unit ranking board.

Open the latest fleet mirror →
Authorised output

Named evidence pack

A named BM Unit cadence profile can be produced when the asset holder or authorised counterparty asks for it. The output keeps public lenses, internal evidence requests, and non-claims separate.

See the evidence request workflow →
Observable set

What the cadence lens reads

Each observable is a public footprint. None is an internal asset interpretation.

Cadence persistence

How often is it visibly called?

Counts accepted-action participation through time. This can separate occasional visible use from repeated visible participation.

Short-duration cadence

How brief are the calls?

Highlights frequent short instructions where the public record shows a more fragmented action rhythm.

Direction switching

How often does the public direction change?

Reads bid/offer alternation in the accepted-action record. It does not infer internal control stress.

Volume separation

Is cadence different from energy volume?

Separates high-frequency visible participation from high instructed-energy roles. Same revenue line, different public duty question.

Evidence request

What a high-cadence public footprint can justify asking

The public lens does not answer these questions. It makes them specific enough to ask.

Public footprintPossible evidence requestWhat remains outside public data
High cadence, low instructed energyAlign with PCS, thermal, BMS, optimiser, availability, and maintenance logs.Internal duty cost, thermal impact, degradation, warranty effect.
Frequent direction switchingReview whether internal control and cycling assumptions match the observed public rhythm.Control strategy, protection events, sub-settlement response.
Publicly quiet BM footprintCross-check B1610 metering, EAC contracts, MEL/MIL, REMIT, PN/FPN, and registry status.Whether the asset is commercially inactive, physically unavailable, or active outside BM.
Declared / metered differenceRequest owner-side explanation of declaration scope, partial availability, commissioning state, or market route.Final operational reason without owner records.
Current public record

Use the daily cards for current observations

This method page is stable. Current figures live in dated cards because source maturity, data lag, and public lens status change day by day.